side-area-logo

building & large construction

  • Environmental Clearance (EC)
  • Environmental Management Plan (EMP)
  • Consent To Operate (CTE/NOC)
  • ETP/STP (Installation, Operation, Maintenance)
  • Renewable Energy Consulting
  • Pollutant Apportionment Study
  • Environmental Impact Assessment (EIA)
  • Consent To Establish (CTE/NOC)
  • Environmental Due Diligence (EDD)
  • Green Building Consulting
  • Rain Water Harvesting
  • Environment Audit
  • Environmental Clearance
  • Consent from Pollution Control Board (PCB)
  • Forest Clearance
  • Fire Consent/NOC from Fire Department
  • Hazardous Waste Authorization
  • Electronic Waste Authorization
  • Bio-Medical Waste Authorization
  • Scrap Import Authorization
  • Central Ground Water Authority Clearance
  • Ambient Air
  • Ambient Noise
  • Water Quality
  • Soil Quality
  • Meteorology
  • Socio-Economic
  • Biodiversity & Ecology
  • Geology
  • Land Use
  • Environmental Impact Assessment Studies
  • Rehabilitation & Resettlement Studies
  • Traffic Surveys & Axle Load Spectrum Studies
  • Traffic Demand Forecasting & Capacity Analysis
  • Hydrological and Drainage Studies
  • GIS Mapping
  • Preparation of Bid Documents & Evaluation of Bids
  • Detailed Engineering Services
  • Reconnaissance Survey/ Feasibility Report
  • Socio-Economic Studies
  • Procurement of Environment & other clearances
  • Safety and Traffic Management Plans
  • Topographic Surveys
  • Safety Audit
  • Pavement Condition Studies & Overlay Designs
  • Economic & Financial Analysis
  • Project Management Services
  • Detailed Project Report

highway and railways

township area development

  • Environmental Clearance (EC)
  • Environmental Management Plan (EMP)
  • Consent To Operate (CTE/NOC)
  • ETP/STP (Installation, Operation, Maintenance)
  • Renewable Energy Consulting
  • Pollutant Apportionment Study
  • Environmental Impact Assessment (EIA)
  • Consent To Establish (CTE/NOC)
  • Environmental Due Diligence (EDD)
  • Green Building Consulting
  • Rain Water Harvesting
  • Environment Audit
  • Environmental Clearance
  • Consent from Pollution Control Board (PCB)
  • Forest Clearance
  • Fire Consent/NOC from Fire Department
  • Hazardous Waste Authorization
  • Electronic Waste Authorization
  • Bio-Medical Waste Authorization
  • Scrap Import Authorization
  • Central Ground Water Authority Clearance
  • Ambient Air
  • Ambient Noise
  • Water Quality
  • Soil Quality
  • Meteorology
  • Socio-Economic
  • Biodiversity & Ecology
  • Geology
  • Land Use
  • Environmental Impact Assessment (EIA) Studies
  • Environmental Clearance (EC)
  • Detailed Project Report (DPR)
  • Landfill Design, operations, management & closure
  • Development of waste management master plan
  • Environmental Management Plan (EMP)
  • Consent from SPCB
  • Inventorization & Characterization of waste
  • Evaluation of alternative 3R method
  • Design & Evaluation of material recovery

common municipal solid waste

mining of mineral

  • Environmental Clearance (EC)
  • Environmental Management Plan (EMP)
  • Consent from SPCB
  • Mining Plan
  • Sensing Methods
  • Estimating of Reserves & Mine Valuation
  • Logging & Chemical Analysis
  • Analysis & Preparation of DPR etc.
  • Environmental Impact Assessment (EIA) Study
  • Environmental Due Diligence (EDD)
  • Pre-feasibility & Feasibility study
  • Mining Scheme
  • Prospecting
  • Exploration/ Drilling
  • Identification of minerals prospects/deposits
  • Techno-economic Analysis
  • Environmental Clearance
  • Consent from Pollution Control Board (PCB)
  • Forest Clearance
  • Fire Consent/NOC from Fire Department
  • Hazardous Waste Authorization
  • Electronic Waste Authorization
  • Bio-Medical Waste Authorization
  • Scrap Import Authorization
  • Central Ground Water Authority Clearance
  • Ambient Air
  • Ambient Noise
  • Water Quality
  • Soil Quality
  • Meteorology
  • Socio-Economic
  • Biodiversity & Ecology
  • Geology
  • Land Use